STEPHEN HEMPSTEAD HIGH SCHOOL

From Encyclopedia Dubuque
Revision as of 23:16, 13 May 2018 by Randylyon (talk | contribs)
Jump to navigationJump to search

STEPHEN HEMPSTEAD HIGH SCHOOL. Planning for the $5.7 million building began in the fall of 1966 with non-teaching, instructional, and administrative personnel encouraged to help design the building. In January, 1967 an estimated $100,000 was spent purchasing forty acres of land along Pennsylvania Avenue and a $6.7 million bond issue was approved in the spring of 1967. (1)

Construction began in the fall of 1968. Classes scheduled to start in the new building in the fall of 1969 were not able to begin until the spring of 1970 due to bad weather and strikes. The official dedication of the building was held on October 25, 1970.

In 1993 the school pioneered the concept in Dubuque of a "summer clinic" for those who needed help or, in some cases, needed credits for class they had failed. (2)

In May 1998 "Mustang Spirit," a sculpture of four spirited mustangs was unveiled at the school as a tribute to retiring principal Don Moody and soon to retire Bill Peck, Hempstead's assistant principal. The idea for the statue came from English teacher Ken Resch. The sculpture was based on a sketch by Hempstead senior Val Barbaro. Contributions came from students in a career orientation program and in National Honor Society. It was assembled with donated time from workers at JOHN DEERE DUBUQUE WORKS, a school partner. (3)

The new look of Hempstead in 2015. Photo courtesy: Dubuque Community School District
Photo courtesy: Dubuque Community School District
Photo courtesy: Dubuque Community School District
Photo courtesy: Dubuque Community School District
Open House/Dedication on October 3, 2015. Photo courtesy: Dubuque Community School District

In June 2015, the $30 million renovation of the high school was running ahead of schedule. Groundbreaking for the renovation and addition began in May 2013. Following the removal of the former auditorium, work on the administration wing began. A new auditorium and two music classrooms were completed near the beginning of the 2014-2015 school year. Work during the summer of 2015 was directed at completing new science classrooms and a business office for the high school in addition to improvement to the gymnasium and the career-and technical education areas. Work for the entire project was funded by a 1-cent sales tax. The work added 141,209-square feet to the building. (4)

In June 2017 a committee of school board members and swim coaches determined that Hempstead should be the location of the district's new swimming pool. Already the location of a pool, Hempstead would have a diving well and eight-lane pool constructed with existing lockers and corridors maintained. The addition was estimated to cost $7.5 million. Also being considered was a competition pool at Eleanor Roosevelt Middle School. (5)

Dubuque Community School District officials announced in September, 2017 a proposed partnership with the Dubuque Area Swimmin’ Hurricanes (DASH) to expand the size of a planned pool. Under the proposal, DASH would have a 25-year agreement in which it could use the pool when it is not in use by the district, and the organization would raise $1 million to cover the cost of expanding the width of the pool from 60 to 75 feet. (6)

School board members phadapproved plans for a eight-lane, 60-foot-wide pool with a diving well. Cost estimates ranged from $7.2 million to $7.5 million. A project architect estimated that expanding the pool to 75 feet in width would add another $1 million to the project cost. A 75-foot-wide pool would allow swimmers to use 14 to 16 lanes. The new pool would use existing locker rooms and corridors; the existing pool would be used until the new one opened. (7)

The wider new pool would allow the Hempstead and Dubuque Senior High School teams to both start practice right after school. That, in turn, would allow DASH teams access to the pool earlier in the day. Over the course of a year, about 225 children were on DASH teams and 650 took swimming lessons. An additional 25 people were in the adult training program. (8)

On March 20, 2018 the Dubuque School Board voted to reject the bids for the proposed swimming pool. All three were between $900,000 and $1.2 million over what was budgeted. The architects would be asked for modifications including to modify or remove the “minimum experience requirements” for the pool’s sub-contractor. The pool was be rebid early in April. The original start date for construction was pushed back from June 4th to June 12th. The budget for the pool is $7.6 million, with $400,000 in architectural fees. (9)

See: DUBUQUE COMMUNITY SCHOOL DISTRICT

    Richard CORE
    EXPERIMENTAL AUTOMOBILE RACING


---

Source:

1. "Chronology," Telegraph Herald, December 31, 1967, p. 18

2. Krapfl, Mike. "Success Focus of Summer School Clinic," Telegraph Herald, July 2, 1993, p. 3A

3. Krapfl, Mike. "Sculpture Recognizes Moody's Leadership," Telegraph Herald, May 21, 1998, p. 3A. Online: https://news.google.com/newspapers?nid=aEyKTaVlRPYC&dat=19980521&printsec=frontpage&hl=en

4. Becker, Stacey. "Hempstead's $30 Million Facelift Nears Finish Line," Telegraph Herald, June 5, 2015, p. 1

5. "Site Panel: Put New Pool at Hempstead," Telegraph Herald, June 7, 2017, p. 1A

6. Hinga, Allie. "Dubuque School District, DASH Announce New Swimming Pool Partnership," TH Online. September 11, 2017 Online: http://www.telegraphherald.com/news/tri-state/article_757bc4b9-f22d-5abc-a000-426a2fc8fee7.html

7. Ibid.

8. Ibid.

9. "Hempstead Pool to be Rebid," KDTH March 20, 2018. Online: http://kdth.radiodubuque.com/hempstead-pool-to-be-rebidded/